Manufacture
Projects

Here is a selection of just some of our many projects we were proud to be involved with

Slide 1
Slide 1
F1 Arcade

Location - One New Change, London

ECS designed, installed and brought to life the ventilation, comfort cooling, public health and drainage requirements. During the design phase it was important to understand the high tech requirements of the simulators and factor this in when developing the services strategy. This required detailed analysis of both their components, heat generation and power consumption in addition to specific services layout to suit the requirements of the simulators within the venue with the added challenge of keeping to the interior designers brief. Additionally careful consideration was needed for the server room itself due to the complexity of systems it serves.

Slide 1
F1 Arcade

Location - One New Change, London

ECS designed, installed and brought to life the ventilation, comfort cooling, public health and drainage requirements. During the design phase it was important to understand the high tech requirements of the simulators and factor this in when developing the services strategy. This required detailed analysis of both their components, heat generation and power consumption in addition to specific services layout to suit the requirements of the simulators within the venue with the added challenge of keeping to the interior designers brief. Additionally careful consideration was needed for the server room itself due to the complexity of systems it serves.

Slide 1
F1 Arcade

Location - One New Change, London

ECS designed, installed and brought to life the ventilation, comfort cooling, public health and drainage requirements. During the design phase it was important to understand the high tech requirements of the simulators and factor this in when developing the services strategy. This required detailed analysis of both their components, heat generation and power consumption in addition to specific services layout to suit the requirements of the simulators within the venue with the added challenge of keeping to the interior designers brief. Additionally careful consideration was needed for the server room itself due to the complexity of systems it serves.

Slide 1
F1 Arcade

Location - One New Change, London

ECS designed, installed and brought to life the ventilation, comfort cooling, public health and drainage requirements. During the design phase it was important to understand the high tech requirements of the simulators and factor this in when developing the services strategy. This required detailed analysis of both their components, heat generation and power consumption in addition to specific services layout to suit the requirements of the simulators within the venue with the added challenge of keeping to the interior designers brief. Additionally careful consideration was needed for the server room itself due to the complexity of systems it serves.

Slide 1
F1 Arcade

Location - One New Change, London

ECS designed, installed and brought to life the ventilation, comfort cooling, public health and drainage requirements. During the design phase it was important to understand the high tech requirements of the simulators and factor this in when developing the services strategy. This required detailed analysis of both their components, heat generation and power consumption in addition to specific services layout to suit the requirements of the simulators within the venue with the added challenge of keeping to the interior designers brief. Additionally careful consideration was needed for the server room itself due to the complexity of systems it serves.

Slide 1
F1 Arcade

Location - One New Change, London

ECS designed, installed and brought to life the ventilation, comfort cooling, public health and drainage requirements. During the design phase it was important to understand the high tech requirements of the simulators and factor this in when developing the services strategy. This required detailed analysis of both their components, heat generation and power consumption in addition to specific services layout to suit the requirements of the simulators within the venue with the added challenge of keeping to the interior designers brief. Additionally careful consideration was needed for the server room itself due to the complexity of systems it serves.

Slide 1

Puttshack

Location - Watford

Puttshack is a tech infused mini golf centre, which means they don't do lame paper score cards! Many crazy courses which feature custom themed holes, interactive leader boards and a digital prize wheel. ECS carried out the design, installation and commissioning of the entire mechanical services within the venue. This included heating, comfort cooling, ventilation, public health, gas installation above ground drainage.

Slide 1

Puttshack

Location - Watford

Puttshack is a tech infused mini golf centre, which means they don't do lame paper score cards! Many crazy courses which feature custom themed holes, interactive leader boards and a digital prize wheel. ECS carried out the design, installation and commissioning of the entire mechanical services within the venue. This included heating, comfort cooling, ventilation, public health, gas installation above ground drainage.

Slide 1

Puttshack

Location - Watford

Puttshack is a tech infused mini golf centre, which means they don't do lame paper score cards! Many crazy courses which feature custom themed holes, interactive leader boards and a digital prize wheel. ECS carried out the design, installation and commissioning of the entire mechanical services within the venue. This included heating, comfort cooling, ventilation, public health, gas installation above ground drainage.

Slide 1

Puttshack

Location - Watford

Puttshack is a tech infused mini golf centre, which means they don't do lame paper score cards! Many crazy courses which feature custom themed holes, interactive leader boards and a digital prize wheel. ECS carried out the design, installation and commissioning of the entire mechanical services within the venue. This included heating, comfort cooling, ventilation, public health, gas installation above ground drainage.

Slide 1

Puttshack

Location - Watford

Puttshack is a tech infused mini golf centre, which means they don't do lame paper score cards! Many crazy courses which feature custom themed holes, interactive leader boards and a digital prize wheel. ECS carried out the design, installation and commissioning of the entire mechanical services within the venue. This included heating, comfort cooling, ventilation, public health, gas installation above ground drainage.

Slide 1
Fulham School

Location - Fulham, London

At Fulham Senior the stage of the pupils’ educational journey has a real future focus and you can sense it the minute you walk through the doors of their fresh and modern campus in the heart of Fulham. ECS carried out the design, installation and commissioning of the entire mechanical services within the school. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom, kitchen and laboratories and above ground drainage consisting of soil and vent and rainwater pipework.. This project was delivered during COVID so presented many logistical challenges.

Slide 1
Fulham School

Location - Fulham, London

At Fulham Senior the stage of the pupils’ educational journey has a real future focus and you can sense it the minute you walk through the doors of their fresh and modern campus in the heart of Fulham. ECS carried out the design, installation and commissioning of the entire mechanical services within the school. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom, kitchen and laboratories and above ground drainage consisting of soil and vent and rainwater pipework.. This project was delivered during COVID so presented many logistical challenges.

Slide 1
Fulham School

Location - Fulham, London

At Fulham Senior the stage of the pupils’ educational journey has a real future focus and you can sense it the minute you walk through the doors of their fresh and modern campus in the heart of Fulham. ECS carried out the design, installation and commissioning of the entire mechanical services within the school. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom, kitchen and laboratories and above ground drainage consisting of soil and vent and rainwater pipework.. This project was delivered during COVID so presented many logistical challenges.

Slide 1
Fulham School

Location - Fulham, London

At Fulham Senior the stage of the pupils’ educational journey has a real future focus and you can sense it the minute you walk through the doors of their fresh and modern campus in the heart of Fulham. ECS carried out the design, installation and commissioning of the entire mechanical services within the school. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom, kitchen and laboratories and above ground drainage consisting of soil and vent and rainwater pipework.. This project was delivered during COVID so presented many logistical challenges.

Slide 1
Fulham School

Location - Fulham, London

At Fulham Senior the stage of the pupils’ educational journey has a real future focus and you can sense it the minute you walk through the doors of their fresh and modern campus in the heart of Fulham. ECS carried out the design, installation and commissioning of the entire mechanical services within the school. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom, kitchen and laboratories and above ground drainage consisting of soil and vent and rainwater pipework.. This project was delivered during COVID so presented many logistical challenges.

Slide 1
Fulham School

Location - Fulham, London

At Fulham Senior the stage of the pupils’ educational journey has a real future focus and you can sense it the minute you walk through the doors of their fresh and modern campus in the heart of Fulham. ECS carried out the design, installation and commissioning of the entire mechanical services within the school. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom, kitchen and laboratories and above ground drainage consisting of soil and vent and rainwater pipework.. This project was delivered during COVID so presented many logistical challenges.

Slide 1

Frasers Group, Sports Direct

Location - Birmingham, New Street

Expanding on the success of the retailer’s first Birmingham location the 60,000 sq. ft space brings a modern, innovative and sleek experience to the city.
With a need to provide clean air for the retail areas, changing rooms, stock rooms, WC, cleaners store rooms, office and back of house areas. ECS supplied, installed and commissioned fresh air ventilation ductwork, grilles, volume control dampers, fire and fire smoke dampers as required.

Slide 1

Frasers Group, Sports Direct

Location - Birmingham, New Street

Expanding on the success of the retailer’s first Birmingham location the 60,000 sq. ft space brings a modern, innovative and sleek experience to the city.
With a need to provide clean air for the retail areas, changing rooms, stock rooms, WC, cleaners store rooms, office and back of house areas. ECS supplied, installed and commissioned fresh air ventilation ductwork, grilles, volume control dampers, fire and fire smoke dampers as required.

Slide 1

Frasers Group, Sports Direct

Location - Birmingham, New Street

Expanding on the success of the retailer’s first Birmingham location the 60,000 sq. ft space brings a modern, innovative and sleek experience to the city.
With a need to provide clean air for the retail areas, changing rooms, stock rooms, WC, cleaners store rooms, office and back of house areas. ECS supplied, installed and commissioned fresh air ventilation ductwork, grilles, volume control dampers, fire and fire smoke dampers as required.

Slide 1

Frasers Group, Sports Direct

Location - Birmingham, New Street

Expanding on the success of the retailer’s first Birmingham location the 60,000 sq. ft space brings a modern, innovative and sleek experience to the city.
With a need to provide clean air for the retail areas, changing rooms, stock rooms, WC, cleaners store rooms, office and back of house areas. ECS supplied, installed and commissioned fresh air ventilation ductwork, grilles, volume control dampers, fire and fire smoke dampers as required.

Slide 1
Flannels

Location - Braehead, Glasgow

The leading luxury fashion retailer, owned by Frasers Group plc, has taken on a 10,000 sq. ft unit and has committed to a long-term lease. The new store stocks lines for men, women, and junior across a carefully curated collection of designer clothing and accessories from brands such as Alexander McQueen, Balenciaga, Balmain and Off White.
ECS were tasked with providing ventilation for this flannels store in Braehead shopping centre. We had to install air handling units, ductwork, volume control dampers, and fire and fire smoke dampers.

Slide 1
Flannels

Location - Braehead, Glasgow

The leading luxury fashion retailer, owned by Frasers Group plc, has taken on a 10,000 sq. ft unit and has committed to a long-term lease. The new store stocks lines for men, women, and junior across a carefully curated collection of designer clothing and accessories from brands such as Alexander McQueen, Balenciaga, Balmain and Off White.
ECS were tasked with providing ventilation for this flannels store in Braehead shopping centre. We had to install air handling units, ductwork, volume control dampers, and fire and fire smoke dampers.

Slide 1
Flannels

Location - Braehead, Glasgow

The leading luxury fashion retailer, owned by Frasers Group plc, has taken on a 10,000 sq. ft unit and has committed to a long-term lease. The new store stocks lines for men, women, and junior across a carefully curated collection of designer clothing and accessories from brands such as Alexander McQueen, Balenciaga, Balmain and Off White.
ECS were tasked with providing ventilation for this flannels store in Braehead shopping centre. We had to install air handling units, ductwork, volume control dampers, and fire and fire smoke dampers.

Slide 1
Flannels

Location - Braehead, Glasgow

The leading luxury fashion retailer, owned by Frasers Group plc, has taken on a 10,000 sq. ft unit and has committed to a long-term lease. The new store stocks lines for men, women, and junior across a carefully curated collection of designer clothing and accessories from brands such as Alexander McQueen, Balenciaga, Balmain and Off White.
ECS were tasked with providing ventilation for this flannels store in Braehead shopping centre. We had to install air handling units, ductwork, volume control dampers, and fire and fire smoke dampers.

Slide 1

67-75 Sycamore Road

Location - Amersham

Environmental Climate Systems Limited carried out the design, installation and commissioning of the entire mechanical services to 36 No. luxury apartments, shops and underground car parking. This included heating, comfort cooling, ventilation consisting of apartment MVHRs, public health and above ground drainage consisting of soil and vent and rainwater pipework.

Slide 1

67-75 Sycamore Road

Location - Amersham

Environmental Climate Systems Limited carried out the design, installation and commissioning of the entire mechanical services to 36 No. luxury apartments, shops and underground car parking. This included heating, comfort cooling, ventilation consisting of apartment MVHRs, public health and above ground drainage consisting of soil and vent and rainwater pipework.

Slide 1

67-75 Sycamore Road

Location - Amersham

Environmental Climate Systems Limited carried out the design, installation and commissioning of the entire mechanical services to 36 No. luxury apartments, shops and underground car parking. This included heating, comfort cooling, ventilation consisting of apartment MVHRs, public health and above ground drainage consisting of soil and vent and rainwater pipework.

Slide 1

67-75 Sycamore Road

Location - Amersham

Environmental Climate Systems Limited carried out the design, installation and commissioning of the entire mechanical services to 36 No. luxury apartments, shops and underground car parking. This included heating, comfort cooling, ventilation consisting of apartment MVHRs, public health and above ground drainage consisting of soil and vent and rainwater pipework.

Slide 1

67-75 Sycamore Road

Location - Amersham

Environmental Climate Systems Limited carried out the design, installation and commissioning of the entire mechanical services to 36 No. luxury apartments, shops and underground car parking. This included heating, comfort cooling, ventilation consisting of apartment MVHRs, public health and above ground drainage consisting of soil and vent and rainwater pipework.

Slide 1
Smethwick Mosque

Location - Birmingham

ECS carried out the design, installation & commissioning of the M&E building services at Smethwick Mosque. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom & kitchen and above ground drainage. Due to the success of this one and the strong relationships formed we have since started a similar project in the heart of Birmingham.

Slide 1
Smethwick Mosque

Location - Birmingham

ECS carried out the design, installation & commissioning of the M&E building services at Smethwick Mosque. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom & kitchen and above ground drainage. Due to the success of this one and the strong relationships formed we have since started a similar project in the heart of Birmingham.

Slide 1
Smethwick Mosque

Location - Birmingham

ECS carried out the design, installation & commissioning of the M&E building services at Smethwick Mosque. This included heating, comfort cooling, ventilation, public health, gas installation to boiler plantroom & kitchen and above ground drainage. Due to the success of this one and the strong relationships formed we have since started a similar project in the heart of Birmingham.

Back to top